5

Project Planners and Construction Managers  

 

HOME

ABOUT US

WHAT WE DO

SUSTAINABILITY

RECOGNITION

NEWS

CONTACT US

HEAR FROM US

 
  You are here Home // Project Profiles
 

  What We Do  
 

  Our Work  
 

  Project Profiles  
 

  Project Archives  
5 5 5
  The 6 Qualities of Excellence
6
The 6 Qualities of Excellence are at the heart of Commodore’s success.  They’re the behaviors that make it possible for us to deliver on our mission.
5
Click one for more
 
5 5 5
5 5 5
  The Confidence to Take Charge
 
 
  The Capacity to Anticipate

 
  The Ability to focus on the Details

 
  The Spirit to Collaborate

 
  The Creativity to Innovate

 
  The Knowledge to Problem Solve
 
 
 

Read more

 
5
5 5 5
  Sign up:  
 
Subscribe to
Blueprints, our free monthly newsletter, and keep up to date with Commodore people, projects, news and more.
 
 

5
 
Say hello to... archives     Read Now!

Click picture to enlarge

Visit the photo gallery         Visit Now!
 
 
 
 
 

Adage Capital Management

 Back To Case Studies

 
 
8
8 8
 
 

200 Clarendon Street – 51st & 52nd Floor, Boston, MA

 

 
 Project Statistics
         
  Owner's Representative   Shermen Group
  Size  

16,000 SF

 
  Architect  

Gensler

 
         
         
         
 
     
 

Located on the 52nd floor of 200 Clarendon, Adage Capital’s rapid expansion required a second phased, occupied renovation shortly after Commodore completed the initial build-out of the existing space.

Construction consisted of three new conference rooms, connecting stairway, kitchen space, offices, refinished flooring and complete carpet replacement. The kitchen area was re-built with cherry cabinets and flooring. The ceiling was treated with a baswaphon coating to ensure the highest level of acoustical integrity and lighting fixtures were chosen carefully to fit the new ceiling material.

Commodore worked extensively with Gensler during the preconstruction process to prepare for the intricate installation of the center-stringer-stair design.

Burl eucalyptus millwork was chosen for the office front system to match the existing space. Specialty metal was used on a slat-wall ornamental system to block the conference room from the stair.

A golf shoot was installed on the 52nd floor for successful putters who can find their ball on the 51st floor.

   
 
   
 
   
 
   
 
   
 
 
 
 
5

| Home | About Us | Portfolio | News | Contact Us | Site Map | Privacy Policy |
© 2006 All Rights Reserved.

Commodore Builders - 80 Bridge Street, Newton, MA 02458  617.614.3500 info@commodorebuilders.com