5

Project Planners and Construction Managers  

 

HOME

ABOUT US

WHAT WE DO

SUSTAINABILITY

RECOGNITION

NEWS

CONTACT US

HEAR FROM US

 
  You are here Home // Project Profiles
 

  What We Do  
 

  Our Work  
 

  Project Profiles  
5 5 5
  The 6 Qualities of Excellence
6
The 6 Qualities of Excellence are at the heart of Commodore’s success.  They’re the behaviors that make it possible for us to deliver on our mission.
5
Click one for more
 
5 5 5
5 5 5
  The Confidence to Take Charge
 
 
  The Capacity to Anticipate

 
  The Ability to focus on the Details

 
  The Spirit to Collaborate

 
  The Creativity to Innovate

 
  The Knowledge to Problem Solve
 
 
 

Read more

 
5
5 5 5
  Sign up:  
 
Subscribe to
Blueprints, our free monthly newsletter, and keep up to date with Commodore people, projects, news and more.
 
 

5
 
Say hello to... archives     Read Now!

Click picture to enlarge

Visit the photo gallery         Visit Now!
 
 
 
 
 

FLIR Systems

 Back To Case Studies

 
 
8
8 8
 
 

25 Esquire Road, North Billerica, MA

 
     
 
 Project Statistics
         
  Owner Reference   Chuck Michel
  Architect   Design-Science  
  Program Manager   CRESA Partners  
  Size    117,000 SF  
         
         
         
 
     
 

FLIR Systems is a world leader in the design, manufacturing and marketing of thermal imaging and stabilized camera systems.

Just as their lease was expiring, FLIR was outgrowing their space. Commodore was chosen as the Construction Manager to renovate their new facility at 25 Esquire Road, with the confidence that we would meet the critical 12-week, fast-track schedule.

The relocation and expansion project consisted of renovations to a former semiconductor facility, and modifications to an existing 20,000 SF clean room to house FLIR’s manufacturing process. The MEP infrastructure needed work. The facility required reconfiguring. The sprinkler coverage was modified to bring it up to code and selective finishes were upgraded. The new facility includes administrative offices, R&D laboratories and production spaces. 

During the existing conditions review, Commodore discovered excessive moisture penetrating the slab of the new facility. The Commodore team responded immediately and was able to solve the problem without delaying the 12-week construction schedule.

“Commodore Builders assembled an excellent team to implement what was not an easy project” 

- Robert Lovrud, Design-Science

 

 

   
 
   
 
   
 
 
5

| Home | About Us | Portfolio | News | Contact Us | Site Map | Privacy Policy |
© 2006 All Rights Reserved.

Commodore Builders - 80 Bridge Street, Newton, MA 02458  617.614.3500 info@commodorebuilders.com